CTF3: Difference between revisions
Appearance
Page created automatically by script |
No edit summary |
||
| Line 1: | Line 1: | ||
'''CTF3''' ('''CLIC Test Facility 3''') was an electron accelerator facility built at CERN with the aim of demonstrating the key concepts of the Compact Linear Collider accelerator. The facility consisted in two electron beamlines to mimic the functionalities of the CLIC Drive Beam and Main Beam. The facility stopped its operation in December 2016, and one of its beamlines has been converted into the new CERN Linear Electron Accelerator for Research (CLEAR) facility. | |||
For more information, see [[wikipedia:CTF3|Wikipedia]]. | |||
[[Category:Abbreviations]] | |||
[[Category:CERN particle accelerators]] | |||
[[Category:FAPlist]] | |||
[[Category:Pages linking to Wikipedia]] | |||
Latest revision as of 05:53, 31 March 2026
CTF3 (CLIC Test Facility 3) was an electron accelerator facility built at CERN with the aim of demonstrating the key concepts of the Compact Linear Collider accelerator. The facility consisted in two electron beamlines to mimic the functionalities of the CLIC Drive Beam and Main Beam. The facility stopped its operation in December 2016, and one of its beamlines has been converted into the new CERN Linear Electron Accelerator for Research (CLEAR) facility.
For more information, see Wikipedia.