Proton Synchrotron and Synchro-Cyclotron Committee: Difference between revisions
Appearance
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
In 1978 the Synchro-Cyclotron Committee (SCC) and Proton Synchrotron Committee (PSC) fused into the '''Proton Synchrotron and Synchro-Cyclotron Committee (PSCC)''' to advise on research at both machines (PS & SC). | In 1978 the [[Synchro-Cyclotron Committee|Synchro-Cyclotron Committee (SCC)]] and [[Proton Synchrotron Committee|Proton Synchrotron Committee (PSC)]] fused into the '''Proton Synchrotron and Synchro-Cyclotron Committee (PSCC)''' to advise on research at both machines ([[Proton Synchrotron|PS]] & [[Synchro-Cyclotron (CERN)|SC]]). | ||
When the SC was shut down in 1990, the management of matters concerning [[ISOLDE]] (which moved to the Booster at the PS) was transferred to the ISOLDE Committee (ISC), and management of Low Energy Antiproton Ring (LEAR) was transferred to the Super Proton Synchrotron Committee (SPSC). | When the SC was shut down in 1990, the management of matters concerning [[ISOLDE]] (which moved to the Booster at the PS) was transferred to the [[ISOLDE Committee|ISOLDE Committee (ISC)]], and management of [[Low Energy Antiproton Ring|Low Energy Antiproton Ring (LEAR)]] was transferred to the [[Super Proton Synchrotron Committee|Super Proton Synchrotron Committee (SPSC)]]. | ||
Revision as of 21:47, 14 January 2026
In 1978 the Synchro-Cyclotron Committee (SCC) and Proton Synchrotron Committee (PSC) fused into the Proton Synchrotron and Synchro-Cyclotron Committee (PSCC) to advise on research at both machines (PS & SC).
When the SC was shut down in 1990, the management of matters concerning ISOLDE (which moved to the Booster at the PS) was transferred to the ISOLDE Committee (ISC), and management of Low Energy Antiproton Ring (LEAR) was transferred to the Super Proton Synchrotron Committee (SPSC).